Why Kelly Roofing

Our Commitment to Our Customers

We use the highest quality products available to ensure the best looking roof affording you the protection and safety you deserve.

Our professional staff will assist you through every step.

We offer long-term roofing solutions paired with the best roofing systems available.


Free Certified Roof Inspection

Benefits:

  • Know your roof's remaining life
  • Leak detection
  • Hurricane Resistance
  • Energy Footprint
  • Avoid being dropped by your insurance company

Schedule Your Roof Inspection

(239) 435-0014

If you'd like to schedule a free appointment with one of our well-trained knowledgable representatives please click on the below button.

Inspection

Flat Roof Systems in Naples Florida
Flat Roof Systems
 

Stimulus Rebates

Kelly
“Very satisfied. Good work. Excellent workers. And all ahead of schedule! Thanks.”

Barbara Caldwell
Naples, FL
Roofing Contractor
Flat Roof Gallery
Return to Main Gallery

Kelly Roofing Step by Step Flat Roof Roofing Process

 
1. Clean existing roof system as needed including flashings, boots, vents, and rotted wood areas.
 
 
2. Remove and replace any and all rotted roof sheathing throughout entire roof area.
 
 
3. Remove and replace any and all rotted fascia.
 
 
4. Disconnect existing a/c units using licensed a/c contractor.
 
 
5. Manufacturer and install new aluminum a/c stands to meet code requirements and fasten to deck.
 
 
6. Reconnect existing a/c units using licensed a/c contractor.
 
 
7. Install new a/c quick disconnects, where needed.
 
 
8. Install eps fan fold insulation to the entire roof’s surface, fastened.
 
 
9. Install tie-in roofing materials as needed to match existing roof, where applicable.
 
 
10. Specially design a high wind resistant duro-last pvc/cpa single-ply roof system including membrane, flashings, vents, boots, curbs, and fasteners entire roof area.
 
 
11. Install duro-last membrane entire roof area using poly-plates and duro-last screws, fastened to cad specifications, color white.
 
 
12. Install duro-last parapet membrane entire perimeter of roof, fastened to cad specifications, where applicable.
 
 
13. Install new perimeter flashings including fascia bar - fascia cap - drip edge, fastened 6" on center. Seal top flange of fascia bar/cap using duro-caulk duro-caulk sealant, where applicable.
 
 
14. Install new duro-last boots over plumbing stacks, weld-band-seal, where applicable.
 
 
15. Install new duro-last curb at existing vent stacks, weld-band-seal, where applicable.
 
 
16. Install duro-last safety walk-pad network from roof access point to a/c units for roof traffic personnel, where applicable for rooftop access.
 
 
17. Install duro-last wind-baffle vacuum moisture control vents for increased roof system wind uplift.
 
 
18. Install duro-last rooftop sign describing care, warnings, and notices for roof traffic personnel.
 
 
19. Clean up and remove all debris. Use magnet to remove fasteners from lawn.
 
 
20. Fifteen (15) year guarantee on all materials, labor, and installation from duro-last. (commercial applications only)
 

   
Copyright ©2008 Kelly Roofing. All Rights Reserved.
Website Design by: Art Unlimited
Privacy Policy
465 Production Blvd. | Naples, FL 34104
Phone: (239) 435-0014 | Fax: (239) 435-0019
E:mail: mail@kellyroofing.com