Steps

1. Complete removal of the existing roof system including shingles, tile, asphalt sealants, boots, vents, and fasteners.
2. Remove and replace any and all rotted roof sheathing throughout entire roof area.
3. Remove and replace any and all rotted fascia board that is accessible without the removal of exterior structures.
4. Refasten entire roof deck using 8d ring shank nails to “code plus” strength.
**Note: this step may qualify for insurance reductions**

*Options To Decide
5. Install new modified rubber self-adhered leak barrier underlayment to entire roof surface.
**Note: use of this underlayment may qualify for a reduction on your insurance.**

*Options To Decide
6. Install new modified rubber flat roof membrane at flat roof tie-in, fastened where applicable.
7. Install new modified rubber flat roof membrane at flat roof tie-in, fastened and masticsized, where applicable.
8. Install new VELUX, self-flashed, all in one tempered glass hurricane rated, leak proof skylights over existing openings, fastened and masticsized where applicable.

*Options To Decide
9. Install new lead boots over plumbing stacks, fastened and masticsized, where applicable
10. Install new vents over kitchen, dryer, and bathroom exhaust openings, fastened and masticsized, where applicable.
11. Install new pre-painted drip edge flashings entire perimeter of roof, fastened and masticsized. Color as per customer choice - 4 available.
12. Install new valley metal down all valley areas, fastened and masticsized where applicable.

*Options To Decide
13. Paint all boots and vents to match shingle color where applicable.
14. Install special high wind resistant starter-strip shingles at perimeter of roof area, fastened and masticsized.

*Options To Decide
15. Shingle entire roof area using ultra high definition asphalt/fiberglass, fungus resistant shingles, nailed six (6) nails per shingle.

*Options To Decide
16. Install special high wind resistant, gafelk seal-a-ridge cap shingles at all crown and hip areas, fastened.

*Options To Decide
17. Install new solar powered attic ventilators with thermostat control, Shingle Ridge Vent or Shingle Off Ridge Vent to achieve proper attic ventilation.

*Options To Decide
18. Clean up and remove all debris. Use magnet to remove fasteners from lawn.
19. Schedule a certified inspector to complete a full warranty inspection of the roof. *Options To Decide
20. Lifetime warranty on shingles including a twenty (20) year ndl (no dollar limit) labor/workmanship warranty. *Options To Decide